“Parcel B”: The Second Phase of Steward Manor Apartments

This survey, originally dated 12/4/59 and signed by Ben Dyer, shows “Parcel B”—the second of three phases of construction that produced Steward Manor Apartments. Parcel B is comprised of the block of Woodland Ct. west of Parkside Dr. (building numbers 2 through 14, respectively). It also includes the asphalt street and parking spaces of Sharon Ct. west of Parkside Dr., although the buildings themselves would come later as part of Parcel C.

The drawing shows incredible detail—much of which hasn’t changed in the nearly 52 years since it was rendered.

Below is a storm drainage plan—also from Ben Dyer Associates in 1959—showing the “existing buildings” of Parcel A (the blocks of Woodland and Sharon Ct. east of Parkside Dr.) as well as the extension of Woodland Ct. that would complete Parcel B.

With 15 buildings, Steward Manor Apartments was nearing the halfway mark. Parcel C would be the final and most ambitious phase yet.

Click the images to view at a larger size.

Advertisements

About Richard Friend

I'm a graphic designer and creator of "Lost Laurel"—a collection of photos and print ephemera chronicling the countless stores, restaurants, and other long-lost merchants of Laurel, Maryland. I'm interesting in hearing from any former/current residents, especially those with vintage photos, literature, and recollections of the community. richardfrienddesign.com lostlaurel.com facebook.com/lostlaurel
This entry was posted in 1950s, 1960s, Artifacts and tagged , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s